Ah, great, K-Rails...   A man made device meant to hold trash on the 
non-traffic (aka bike side) of a path.   Brings back memories of 
construction on I-5 and Sorrento, lots of debris in the k-railed bike 
lane there. :)  This debris in the roadway thing keeps coming up. :)

Whoa...  2 way bike path on the same shoulder??   I don't know about you 
guys but I routinely hit 50+ coming down either side of the 52, and most 
roadies are in the 40+ range.  How wide is a Class I two way bike path? 
  I see some head-on collisions in the future with the speeds that are 
frequently obtained descending that hill.  Personally I'm very happy 
with the current setup, nothing like passing cars while they're stuck in 
congestion.  :)

Mark


Kathy Keehan wrote:
> Information on SR52 bike access impacts due to widening project. Not sure
> when the actual change to the bike access will take place, but it will be
> sometime this year.
> Kathy
> 
> -----Original Message-----
> From: Bob James [mailto:bob_james at dot.ca.gov] 
> Sent: Tuesday, February 26, 2008 11:38 AM
> To: Kathy Keehan
> Cc: Bob James; Chris Schmidt
> Subject: As Follow-up, Again...
> 
> 
> Please be advised:
> 
> Beginning in March, 2008, and continuing for about a year, construction on
> a segment of SR-52 will begin.  (This segment of SR-52 is between Santo
> Road in the Tierrasanta area to Mast Blvd. in the Santee area;  currently,
> bikes are permitted to ride on the shoulders of this segment.)
> 
> There will be 4 stages of construction and bikes will have continued access
> through this corridor during all 4 stages of construction.
> 
> Specifically, Stage 1A and 1B will add lanes on SR 52 between I-15 and
> Santo Rd, where bikes will not be affected.
> 
> Stage 2 will add lanes in the median. Bikes will continue to be able to use
> outside shoulders.
> 
> Stage 3A and 3 B will reconstruct the Santo Rd/ WB off ramp intersection,
> and will include drainage work on the WB, outside shoulder. The EB outside
> shoulder (the south shoulder) will be converted into a two way bikepath
> during this stage.
> 
> Stage 4 will complete the construction of drainage facilities on the EB,
> outside shoulder. By now, bikes will be using a two-way Class I Bike Path
> on the WB outside shoulder, separated by K-rail.
> 
> There may be some minor impacts to bikes while K rails are installed, but
> these impacts should be very minimal. We expect K-rails will be placed at
> nights.
> 
> 
> _______________________________________________
> 
> You are subscribed to the SDCBC mailing list as markw at wolfenet.org
> To unsubscribe or change mailing options, go to http://www.bikesandiego.org/mailman/listinfo/sdcbc
> List privacy information is located at http://www.stickman-computing.org/aup
> For help or to talk with someone other than the mail robot, send e-mail to postmaster at stickman-computing.org



More information about the SDCBC mailing list